Learn How to Fight Locally

Preamble: How to Talk About Electromagnetic Power Through the Air

   

47 U.S. Code § 324:
“In all circumstances . . . all radio stations . . . shall use the
minimum amount of power necessary to carry out the communication desired.”
(June 19, 1934, ch. 652, title III, § 324, 48 Stat. 1091.)


Dec 1, 2020 — Taming the 4G/5G Infrastructure Grid in Santa Barbara County, CA

Read the Supporting Letters . . .




Sept 16, 2020 — Taming the 4G/5G Infrastructure Grid in New York, NY

View the Boise Planning Commission Small Cell WTF Appeal from Sept 14, 2020 . . .




Aug 4, 2020 — Taming the 4G/5G Infraastructure Grid in Easton, CT



Key Links to Explore

https://scientists4wiredtech.com/campanelli

https://scientists4wiredtech.com/thisworks/

https://scientists4wiredtech.com/3g-4g-5g-national-security-failure/

https://scientists4wiredtech.com/action/nepa-strategies

https://scientists4wiredtech.com/osha

https://scientists4wiredtech.com/vhp

https://ourtownourchoice.org/vhp/

https://ourtownourchoice.org/glenellyn/we-want-it/

https://ourtownourchoice.org/glenellyn/il-hb-5818-to-give-local-governments-a-say-in-densified-4g-5g-wireless-grid/

https://ourtownourchoice.org/glenellyn/improved-ordinance/#fttp

https://scientists4wiredtech.com/petaluma/petaluma-municipal-code/

https://scientists4wiredtech.com/donate


July 23, 2020 — Taming the 4G/5G Infrastructure Grid: Technical and Lobbying Strategies




July 9, 2020 — Listen to Expert Advice at 43:00 in the Video (scrub forward)